Tadweld partnered with Refresco to deliver complex access platforms and bespoke steelwork solutions across their Pontefract site, ensuring safe access while maintaining continuous production.

Image
Image
Following several recent line upgrades, Refresco’s site required safe, practical access to both new and existing equipment. Tadweld delivered a range of tailored solutions, including a filler access installation completed in just two weeks, from site survey and material procurement through to final installation. This rapid turnaround minimised disruption and eliminated downtime, while maintaining the highest safety standards throughout.

Challenges:

  • Working from third-party drawings while adapting designs on-site to meet evolving project requirements.
  • Installing large multi stair crossovers between conveyor loops, ensuring engineer access to critical areas.
  • Relocating parts of existing platforms without impacting ongoing production.
  • Creating a solution for access to the top of a new filler, when the exact equipment location was unknown until install.
  • Minimising downtime during installation and coordinating multiple project elements at the same time.

Actions:

  • Tadweld collaborated closely with the project team and site team to refine layouts and stair locations, iterating multiple designs until the final solution was agreed.
  • Modified an existing walkover to create space for the new conveyor and increase employee efficiency from different areas of the factory.

     

  • Moved existing high level platform legs to allow installation of a new packaging line, which included calculations, fabricating new parts and matching existing paintwork.
  • Conducted detailed on-site measurements and assessments, implementing all necessary RAMS for safe and efficient work.
  • Coordinated fabrication and installation timelines with the customer and other trades, allowing critical measurements of the new filler to be taken before rapid fabrication and installation.

Results:

  • Successfully delivered multiple complex platform and access solutions with minimal disruption to ongoing production.
  • Provided a flexible, future-proof solution, allowing for seamless amendments once production lines are in place.
  • Completed the final filler access installation in under two weeks, meeting tight project timelines.
  • Ensured high levels of site safety, efficiency, and customer satisfaction, resulting in an extremely happy Refresco team.

     

     

“Partnering with Tadweld has been a seamless experience from start to finish. They delivered safe, efficient access solutions quickly, with minimal disruption to our production. Their flexible approach and professionalism made a real difference, and we’re very pleased with the results"

- Richard Marsh, Engineering Projects Manager

 